PGI delivered the second of two Produced Water Treatment packages for PDO in Oman. These packages comprised 3 parallel trains of Deoiling and Desanding hydrocyclones, with all pumps, vessels & piping manufactured from a max of Duplex & Super Duplex Stainless Steels.
The packages are designed to operate at a remote semi-manned site, and process up to 125,000 BWPD of produced water, while recovering solids and residual oil.

Preparation for shipment of the second Package from PGI’s Abu Dhabi Faciliy to Oman.

Installation of the 1st Produced Water Treatment package at PDO’s Musallim facilities in Oman.