Search
design / fabrication / installation
News
News & Events
Current  Archive    
PGI exhibiting at the Saudi Arabian Oil & Gas Exhibition, Oct 2010
Wednesday, July 28, 2010


Process Group International are pleased to be exhibiting at the upcoming Saudi Arabian Oil & Gas Exhibition in Dammam, Saudi Arabia; 10-12 October, 2010.

Read More
    
PGI delivers TEG Gas Regeneration package for India
Wednesday, July 28, 2010


Process Group International (PGI) shipped out a TEG Regeneration skid from their 24,000m2 facility in Abu Dhabi, in the United Arab Emirates.

Read More
    
Process Group International grows to meet the demands of the market
Thursday, July 01, 2010


Process Group International in Abu Dhabi has been adding staff in response to a buoyant order book and exceptionally strong growth prospects.

Read More
    
Process Group announces Premium Hydrocyclone Materials
Thursday, July 01, 2010


Process Group recently announced the launch of its new premium TUNGSTONE ® range of materials from which their Desander & Deoiler Hydrocyclones are now manufactured.

Read More
    
PGI delivers Gas Sweetening Plant for RAK Gas
Wednesday, November 11, 2009


Rak Gas LLC, Ras Al Khaimah (UAE) awarded PGI a project to supply a Gas Sweetening plant for the "Bukha Gas Sweetening Plant".

Read More
    
PGI awarded a Produced Water Treatment package for ONGC India
Wednesday, November 11, 2009


PGI was recently awarded a contract to design and fabricate a Produced Water Conditioning package for ONGC's Heera field facilities as part of the Neelam Heera platform refurbishment project.

Read More
    
PGI awarded a Gas Dehydration package for ONGC India
Thursday, November 05, 2009


PGI was recently awarded a contract to design and fabricate a Gas Dehydration package for ONGC's ICP-R platform, by Afcons-Gunanusa.

Read More
    
Mukhaizna Water Treatment Units Commissioned
Sunday, July 12, 2009


Process Group International recently delivered 4 Induced Gas Flotation (IGF) Packages to Occidental for their Mukhaizna Central Processing Facility.

Read More
    
PGI’s workforce exceeds 180 people
Friday, March 28, 2008


With over 140 tradesman located between PGI’s Mussafah factory in Abu Dhabi and the Aweer construction site in Dubai, PGI’s factory now has over 25 Discipline engineers and Project/Site Managers and 15 people involved in QA/QC, HSE and workshop management.

Read More
    
April 07: PGI receives $27M order from Doosan
Friday, March 28, 2008


PGI received a $27 M order from Doosan for the Jebel Ali M Station Fuel Gas System, under construction for Dubai Electricity & Water Authority (DEWA).

Read More
    
PGI Delivers Produced Water Treatment packages
Tuesday, January 01, 2008


PGI delivered the second of two Produced Water Treatment packages for PDO in Oman.

Read More
    
ASME Approval for Abu Dhabi Fabrication Workshop
Tuesday, December 04, 2007


PGI is pleased to announce that the Abu Dhabi facility has been approved as an ASME, Section VIII, Division 1 fabrication workshop, and is now able to manufacture "U" Stamp pressure vessels.

This approval continues the successful expansion of capabilities of the business in Abu Dhabi, and is well timed to coincide with the construction of a new dedicated Pressure vessel fabrication workshop.
Read More
    
PGI/Euromechanical Open New Workshop
Saturday, December 01, 2007


PGI/Euromechanical opens their new pressure vessel workshop. This dedicated facility is to be utilized for building pressure vessels that PGI required for the increasing number of projects being undertaken.

Read More
    
PGI Receives $1.0M Order
Thursday, November 01, 2007


PGI receives a $1.0M order from Creative Power Solutions (CPS) for the supply of a fuel gas system for the Doha Gas Turbine Power project, Kuwait.

Read More
    
PGI receives $6M Order
Saturday, September 01, 2007


PGI receives a $6M order from ETA for the installation of Fuel Gas Skids for the Aweer Station H, Phase III Project.

Read More
    

Copyright (c) 2010 Process Group International | Login